FABRICATION PROCESS / AGENT SCHEMA

Kitting

Consolidation, verification, labeling, and packaging of complete part sets.

building supplyassembly

From design artifacts to a quote-ready package.

Process support indicates configurable network coverage, not a guaranteed quote or supplier qualification.

01

Define

Material, quantity, function, interfaces, dimensional needs, destination, and timing.

02

Attach

Versioned design, drawing, inspection, and supporting files remain private until disclosure approval.

03

Validate

SupplySlate returns blocking errors, warnings, missing information, passed checks, and unavailable checks separately.

04

Source

A human approves suppliers, recipient, message, and exact artifact scope before dispatch.

PROCESS REQUIREMENTS

Machine-readable inputs.

Supplier qualification and final engineering acceptance require explicit evidence.

REQUIRED
01quantity
02bom revision
RECOMMENDED
01labeling
02packaging
03traceability